Sheenstar

Mango juice production line

  • washing filling capping 3 in 1
  • full automatic
  • stainless steel material
  • sseparated control cabinet (touch screen, PLC), easy operate and maintaince
  • CE, SGS, ISO9001

Product Description

This mango juice production line includes air conveyors and washing filling, capping and labeling machine. The production capacity can be
The juice filling machine model is RXXGF16-16-16-5, it have two washing part, the first washing part is for washing the bottles with disinfectant, and the second washing part is for washing the bottles with pure water.
The filling part has 16 filling heads, it can filling 4000 bottles of juice per hour base on 500ml plastic bottle, the filling valve can fill juice accurately.
The caps go to the capping part by cap elevator and disinfected in disinfection pipeline, after capping, the bottled juice will go to the labeling system by stable conveyor.
The labeling system includes 3 main parts: label sleeve machine, shrink tunnel and steam generator.
All the machines made of high quality stainless steel 304,the filling part made of stainless steel 316. All electrical components are from world famous brands.

Get A Free Quote Now

Products Details

Technical Parameter

MODELRXGF14-12-5RXGF18-18-6RXGF24-24-8RXGF32-32-10RXGF40-40-12RXGF50-50-12
PRODUCTION CAPACITY(500ML BPH)2000-24004000-60006000-1000010000-1500015000-2000020000-24000
FILLING PRECISIONLIQUID LEVEL±2MM
BOTTLE SIZE(MM)DIAMETER50-100 HEIGHT 150-310
CAP SHAPEPLASTIC SCREW CAP
WASHING WATER PRESSURE(MPA)0.2-0.25
GAS CONSUMPTION(M3/MIN)0.10.10.40.50.50.6
POWER(KW)34.45.26.27.810
WEIGHT(KG)200028004500600070009500
DIMENSIONS(L*W*H MM)2080*1560*21302360*1830*22502900*2200*22503880*2200*22503700*3000*23504500*3500*2400

Video

Fast Answer Your Questions

As a manufacturer, we have been in beverage machine industry for more than 10 years, our factory is in Leyu Town,Zhangjiagang city which is near Shanghai and Wuxi.
Yes, we have ISO, CE, SGS.
It will be showed in the quotation. Send me inquiry. Normally 45 days.
Up to you, T/T, L/C, western union and others will be ok
The engineer will install the machine for you, and train your employee, also We will give you the handbook.

Keep in touch

Fill in your details and we’ll get back to you in no time.