Sheenstar

XGF32-32-8 15000bph 500ml automated bottle water filling machine

  • two year after sale service free
  • easy changing of bottle model
  • Over sea installation
  • scientific process flow

Product Description

  1. Sheenstar provide whole water filling producing line, the water filling machine is the key machine.
  2. The bottle water washing filling capping 3 in 1 machine equipped with the cap elevator, and electric control cabinet.
  3. The filling machine equipped with a cover disinfection and cleaning channel.
  4. The caps come to the channel by the cap elevator. First,disinfected by disinfectant,second washed by the pure water, then hot water, Finally, after blow drying, it reaches the 3 in 1 machine capping part.
  5. All the machine made of high quality stainless steel 304,the filling valve is made of stainless steel 316.
  6. Reduced filler enclosure and servomotors reduce resource consumption.
  7. The world-famous brand of electrical components and touch screen make the machine control simplely.
  8. If there is a fault, it will automatically stop and light up the warning light to inform the staff in time.

Get A Free Quote Now

Products Details

Technical Parameter

ModelXGF14-12-5XGF16-16-5XGF18-18-6XGF24-24-8XGF32-32-8XGF40-40-10XGF50-50-12
Washing Heads14161824324050
Filling Heads12161824324050
Capping Heads556881012
Capacity (b/h)500080001000012000150002000026000
Power (kw)1.52.22.2337.59
Dimensions (mm)2200*1550*24502850*2450*24502910*2150*24502850*2200*24503430*2630*24504300*2930*24505000*3840*2450
Weight2000240025004200600070009000
Voltage380V
Suitable Bottle Shapecircular, square, customized
Suitable capsplastic screw cap
Bottle Diameter(mm)50-90
Bottle Height(mm)150-310
Compressed Air Pressure(Mpa)0.3-0.7
Washing Medium aseptic water
Washing pressure(MPA)0.25

Video

Fast Answer Your Questions

As a manufacturer, we have been in beverage machine industry for more than 10 years, our factory is in Leyu Town,Zhangjiagang city which is near Shanghai and Wuxi.
Yes, we have ISO, CE, SGS.
It will be showed in the quotation. Send me inquiry. Normally 45 days.
Up to you, T/T, L/C, western union and others will be ok
The engineer will install the machine for you, and train your employee, also We will give you the handbook.

Keep in touch

Fill in your details and we’ll get back to you in no time.