After strict quality inspection, each component is being assembled onto the filling machine by engineers. In this picture, you can see two engineers debugging two different filling machines. One is a water filling machine used for filling bottles ranging from 200ml to 2L, and the other is a water filling machine used for filling large bottles ranging from 5L to 15L. These two machines are both equipped with three in one flushing, filling, sealing, and cap disinfection .

Experienced engineers are systematically installing and debugging the equipment. We will conduct trial runs on each machine in the factory, so that the machines can be put into production more quickly after arriving at the customer’s factory. Engineers will also arrive at the customer’s factory to train the relevant operators, ensuring better operation and maintenance of the machines.